ROCKVANTA Machinery VIBRATING SCREEN SELECTION CHECKLIST Use this as a starting brief. Mark unknowns rather than guessing. This is not a machine design, capacity guarantee or operating instruction. MATERIAL AND FEED - Material and source; sample identification and sampling date: - Feed size distribution; largest expected lump; near-size fraction: - Bulk density and measurement basis: - Moisture range, clay/sticky fines, particle shape and seasonal variation: - Normal and peak feed rate, units, wet/dry basis and measured/estimated status: - Mass unit written in full: metric tonnes or US short tons (or specify another unit): - Feeding method, batch size if relevant, loading height and distribution: REQUIRED SEPARATION - Desired size range and acceptable misplaced material for each outlet: - Required usable-product output rate and units: - Proposed aperture if known; required number of fractions/decks: - Dry screening or wet duty; water addition and drainage if applicable: - Existing blockage or wear issues, photographs and operating conditions: SITE AND INTERFACES - General arrangement, footprint and access: - Feed height, discharge positions and downstream equipment: - Supports/foundation; proposed static and dynamic loads for engineering review: - Media replacement and drive-removal clearance: - Voltage, frequency, phase, controls and site service restrictions: - Dust, weather, corrosion, noise, operating hours and transport limits: SUPPLY SCOPE - Machine only, integrated plant or replacement media: - Exact reference model, drawing revision or existing machine identification: - Required deviations from the reference: - Included hopper, drive, frame, chutes, conveyors and controls: - Installation, guarding and isolation responsibilities: QUOTATION AND ACCEPTANCE - Equipment included and excluded; assumptions and unresolved questions: - Capacity figure basis: feed versus accepted product, mass versus volume: - Representative feed sample, agreed test conditions and sampling method: - Required product grading and agreed acceptance criteria: - Drawings, checks, identification and documents to accompany the order: - Destination and requested delivery date: A no-load running check does not establish production throughput or product grading. Operating changes require equipment-specific engineering review. Stop and isolate equipment before close inspection or measurement. Guide: https://rockvanta.com/resources/vibrating-screen-selection-guide/ Equipment: https://rockvanta.com/equipment/screening-machines/ Enquiry: https://rockvanta.com/request-a-quote/#rfq-form